INSTALLATION QUALITY

Fire damper installation QA checklist

The best time to find a wrong product, opening or method is before the wall is closed. This checklist keeps the evidence attached to the exact damper rather than relying on memory at handover.

This is not a universal installation method. Fire and smoke dampers are life-safety devices. The current manufacturer IOM, approved fire strategy, supporting construction and project inspection plan control the work.

1. Before the opening is formed

2. On delivery and before installation

3. During installation

4. Evidence before the wall or ceiling is closed

Take photographs while the information can still be seen. A useful record normally includes:

Photographs need context. A close-up of sealant with no damper tag, location or surrounding construction is difficult to use as evidence later.

5. Before handover